\ OVERVIEW
Assembly & automation
Assembly takes a molded or bonded part through to a finished, inspected and packaged device — at whatever level of automation the program needs. We build by hand at the bench, on fixtured semi-automated stations or on fully automated lines. A fully automated line runs loading, filling, sealing, surface treatment, lyophilized-reagent loading, PSA bonding and vision inspection in one sequence. The automated lines are in our Suzhou facility; chip bonding is done in the US cleanroom. Evaluation builds and production run against the same documentation, so the device you qualify is built the way the volume device will be.


4 processes
In-house: Molding, bonding, treatment & lyo

3 levels
manual · semi-automated · fully automated

100%
vision inspection, not AQL sampling

ISO 7
Class 10,000 molding and assembly

ISO 13485
certified · FDA registered
\ CAPABILITIES
Capabilities and technical specifications
Molding, bonding, surface functionalization and lyophilization feed the line directly, so a part is never handed to another company between the process that made it and the one that consumes it; benchtop to fully automated under one quality system. Vision inspection on every unit, with a defect map per part.
Line capability
Throughput and placement figures are confirmed per program at DFM.
PARAMETER
SPECIFICATION
Cleanroom class
ISO 7 / Class 10,000 for molding and assembly
Line architecture
Workstations connected by automated transfer and electrical control systems
Levels of automation
Manual benchtop · semi-automated fixtures and stations · fully automated robotic lines
Operations available
Loading · filling · dispensing · sealing · labeling · lamination · die-cutting · surface treatment · lyophilized-reagent detection and loading · PSA bonding · vision inspection · packaging
Hybrid constructions
Dedicated workflows for polymer–glass–silicon systems, where the sequence has to respect three materials and three thermal budgets
Inspection coverage
100% automated visual inspection with software-generated defect mapping
Standalone services
Assembly of parts made elsewhere; automated inspection of devices built elsewhere
Minimum order
Quantity one accepted
Throughput · placement accuracy · first-pass yield
Units per hour by line, PSA and component placement accuracy, first-pass yield
Quality system
ISO 13485 certified · FDA registered
Three levels of automation
Every program goes up the same ladder, and we will say when stopping at the second step is the right answer.
ASPECT
MANUAL
SEMI-AUTOMATED
FULLY AUTOMATED
What it is
Benchtop, by hand. Every program starts here, and it should
Operators plus tooling — fixtures and semi-automated stations
Sealing, labeling, lamination, dispensing and die-cutting on a robotic line, with end-of-line testing
What it is for
A process you can watch, measure and correct. This is where the work instructions, fixtures and acceptance criteria get written
The steps that drive yield — alignment, sealing, dispensing — move onto fixtures while judgment stays with the operator
Sustained volume against a frozen process
Choose it when
The device is still changing, or the first units are evaluation builds
Most products ship at this level for a long time
The volume is there and the process has stopped changing
What it costs
Operator variance — the result depends on who built the unit, and when
Fixtures per revision
Flexibility — an automated line becomes a constraint on your own design if the device is still moving
The usual case for automation is labor cost. In microfluidics the stronger one is variance.
A hand-placed PSA layer varies by operator and by hour, and that variance appears downstream as channel-volume drift and assay CV. The line removes the operator from the tolerance stack. It does nothing for a bad method except produce more of it faster — which is why a line is built around a process that has first been run by hand.
Equipment
Fully automated visual defect inspection system — the equipment that inspects every unit and maps its defects.

Each unit is registered to a fixed reference before imaging, so defect coordinates are comparable across the run. The unit is then imaged and classified against the defect library agreed for the device, and each defect is located and mapped on the part. The system runs as part of a line, or as a standalone service on devices built elsewhere.

\ MATERIALS
Materials
Beyond the molded or machined substrate, an assembled microfluidic device is a stack of bought and made components. These are the ones that most often pass through the line.
Device substrates

Thermoplastic parts — COC/COP, PMMA, PC, PS, PP
WHERE IT COMES FROM
Our cleanroom molding or CNC machining, or parts made elsewhere
Bonded before or on the line — PSA lamination in line; thermal, laser and solvent routes on the bonding page

PDMS
WHERE IT COMES FROM
Our PDMS manufacturing
Plasma-activated surfaces begin reverting within about fifteen minutes unless thermally aged, so bonding follows treatment closely

Glass and silicon
WHERE IT COMES FROM
Our glass and MEMS processes
Hybrid polymer–glass–silicon systems run on dedicated workflows, respecting three thermal budgets
Components that pass through the line
COMPONENT
ROLE
ASSEMBLY CONSIDERATION
Pressure-sensitive adhesive (PSA) tape
Sealing layer, channel lid, double-sided bonding between layers
Registration is the constraint — a PSA layer that shifts changes channel volume, so it is applied under vision alignment
Sealing films and foils
Reagent chamber closure, blister sealing
Seal integrity has to survive shipping and storage, not just the seal test on the day
Membranes and filters
Plasma separation, particle capture, vent and hydrophobic barriers
Cannot be heat-bonded without changing pore structure; usually PSA-mounted or clamped
Lyophilized reagent
Dry-stored assay chemistry loaded into the device
Humidity-sensitive — detection, loading and closure are sequenced so the bead is never exposed
Gaskets and O-rings
Compression sealing at fluidic interfaces
Placement force and compression set decide whether the seal holds at pressure
Tubing and fluidic connectors
External interface
Insertion depth and retention are the usual failure modes; both are verified on assembly
Magnetic and functional particles
Sample preparation and capture chemistry
Handled dry or in suspension; may require conformal coating beforehand
Labels and identifiers
Traceability, lot coding
Applied and read back on the line, so the ID on the device matches the record
Two components decide the process order.
Membranes cannot see heat without their pore structure changing, and lyophilized reagent cannot see ambient humidity. Both therefore go in late, under PSA or clamping, and both are verified before the device is closed rather than after.
The related services handle the rest. Every bonding route, including PSA lamination as a standalone service, is on Bonding & sealing. Blisters, capsules, beads and in-situ drying are on Reagent storage & lyophilization. The hydrophilic, hydrophobic and patterned treatments we apply in line are on Surface treatment & functionalization. Grade-level substrate data is in the Materials guide.
\ PROCESS
Assembly process
Evaluation builds by hand and on fixtures; volume on the automated line. One inspection and packaging step for both.
-
Track A — Manual and semi-automated evaluation builds
Where the work instructions, fixtures and acceptance criteria are written. Most products ship from here for a long time.

Assembly requirements
Bill of materials, assembly sequence and acceptance criteria agreed. We receive parts made anywhere and inspect them in.
The 4-week clock starts here

Manual benchtop build
Built by hand so the process can be watched, measured and corrected; work instructions and fixtures come out of this step.
Quantity one accepted

Fixtured semi-automated stations
Alignment, sealing and dispensing move onto fixtures and stations; judgment stays with the operator.
Alignment · sealing · dispensing on fixtures
-
Track B — Fully automated line
As run for centrifugal biochemical assay discs — six operations in a fixed order, the last of them vision inspection, two of them environmentally sensitive.

Automated loading
Substrates fed and registered to the line.
Extended cure for PDMS molds

Filling and sealing
Liquid reagent dosed and chambers sealed.
Seal verified on the line

Hydrophilic treatment
Wettability applied in line, in the correct order — treatment before closure, because a treatment cannot reach a sealed channel.
Before closure, not after

Lyophilized-reagent detection and loading
Each bead is detected before it is placed, so a missing or damaged bead is caught rather than sealed in.
Detected before placed

PSA bonding
Adhesive layer applied under vision alignment and laminated; registration is what holds channel volume.
Under vision alignment
-
Finishing — common to both tracks

Vision inspection and defect mapping
Every unit imaged and classified against the agreed defect library; defects located on the part and aggregated across the run.
100% of units, not an AQL sample

Packaging and release
Lot coding and identifier read-back on the line; individually packaged in PE bags or self-seal sterilization pouches, non-sterile unless sterilization is ordered.
PE bag or sterilization pouch
Process order is what outsourced assembly most often gets wrong.
On a PSA-closed device the surface treatment has to go on before closure; reagent has to be verified before it is sealed in; a placed bead cannot wait at a downstream station in ambient humidity. When the operations sit at different suppliers, nobody owns the sequence. On one line, the sequence is the line.

\ QUALITY CONTROL
Quality control
Coverage
100% automated visual inspection, not AQL sampling
Dimensional
Inspection to the approved drawing and inspection plan
Reagent integrity
Lyophilized bead presence and condition verified before the device is closed
Validation deliverables
IQ/OQ/PQ, process validation reports, defect-library sign-off, customer witness
Defect mapping
Software-generated spatial map per unit, aggregated across the run
Functional
Leak and flow testing where the device requires it
Traceability
Lot coding and identifier read-back on the line
Quality system
ISO 13485 certified · FDA registered · customer audits accepted
Where the defect is matters as much as how many there are.
A count tells you the yield. A map tells you where the failures cluster — at one gate, one station or one edge of the nest. That is the difference between knowing you have a problem and knowing what to change.
\ LEAD TIME & MOQ
Lead time & MOQ

Lead time
4 weeks to set up a new device on a line, from receipt of specific assembly requirements — the bill of materials, the assembly sequence and the acceptance criteria. Repeat lots are quoted per program

Sterilization
Available on request as a supplied service

Indicative pricing
Quoted per program

Minimum order
Quantity one accepted; parts made anywhere

Where the work is done
Automated production lines in the Suzhou manufacturing facility; chip bonding in the US cleanroom; US injection-molding capacity being brought online through a US partner. A program that requires US assembly should say so early — it changes the plan

Delivery format
Individually packaged in PE bags or self-seal sterilization pouches; custom packaging on request. Pouch type is not a sterility claim — parts ship non-sterile unless sterilization is ordered

Scale-up
The same documentation covers evaluation builds and continuous production
“Specific assembly requirements” is the gating item, not the four weeks.
Programs that arrive with the bill of materials, the sequence and the acceptance criteria defined move straight into the four weeks. Programs that arrive with a device and an intention spend time on definition first, and that is usually the longer part.
\ SHOWCASE
Showcase
Sample parts
Three lines running today, each doing something a single supplier usually does not.

Injection molding automation
pipette tips
WHAT IS AUTOMATED
Injection molding, vision-based inspection and automated packaging as one uninterrupted operation in an ISO Class 10,000 cleanroom
WHY IT IS DIFFICULT
High volume with zero tolerance for handling contamination; the value is in never touching the part between press and pack

Downstream assembly automation
centrifugal biochemical assay discs
WHAT IS AUTOMATED
Automated loading, filling and sealing, hydrophilic treatment, lyophilized-reagent detection and loading, PSA bonding, quality inspection
WHY IT IS DIFFICULT
Six operations in a fixed order, two of them environmentally sensitive. Treatment has to precede closure and reagent has to be verified before it is sealed in — get the order wrong and the device is scrap

Automated quality inspection
standalone
WHAT IS AUTOMATED
Automated device alignment, vision-based defect inspection, software-generated defect mapping
WHY IT IS DIFFICULT
Runs on devices built elsewhere, which makes it available to customers who assemble in house but have no inspection capacity

Pipette tips — molded, inspected and packed in one cleanroom cell, never handled between press and pack

Centrifugal assay-disc line — loading through PSA bonding in one fixed sequence

PSA layer applied under vision alignment and laminated

Per-unit defect map — where the failures cluster, not just how many.
Applications
CARTRIDGES
Filled, sealed, reagent-loaded and PSA-bonded cartridges, each one inspected, at consumer unit cost.
SAMPLE PREPARATION
Cartridges carrying membranes, magnetic particles and sealed reagent chambers, sequenced so none is exposed.
SAMPLE-TO-ANSWER
Molecular cartridges where lyophilized reagent is detected and loaded in line, before closure.
CONSUMABLES
Molded, inspected and packed without handling — the cleanroom classification kept through to the sealed bag.