window.onload = function() { if (typeof grecaptcha !== "undefined") { grecaptcha.render('recaptcha-container', { 'sitekey': '6LeALEkrAAAAAEDavc0NiMvKzg5nA-iqvVgzp63W' }); } else { console.error("Google reCAPTCHA failed to load."); } };
top of page
hero

Service \ Assembly & integration \ Assembly & automation

ASSEMBLY & AUTOMATION

Microfluidic device assembly, from manual evaluation builds to fully automated lines.

MATERIAL

Molded parts · PSA · films · membranes · reagent

MINIMUM ORDER

Quantity one

LEAD TIME

4 weeks from agreed requirements

\ OVERVIEW

Assembly & automation

Assembly takes a molded or bonded part through to a finished, inspected and packaged device — at whatever level of automation the program needs. We build by hand at the bench, on fixtured semi-automated stations or on fully automated lines. A fully automated line runs loading, filling, sealing, surface treatment, lyophilized-reagent loading, PSA bonding and vision inspection in one sequence. The automated lines are in our Suzhou facility; chip bonding is done in the US cleanroom. Evaluation builds and production run against the same documentation, so the device you qualify is built the way the volume device will be.

hero
v15_01_four_processes_transparent.png

4 processes

In-house: Molding, bonding, treatment & lyo

v15_02_three_levels_transparent.png

3 levels

manual · semi-automated · fully automated

v15_03_vision_inspection_transparent.png

100%

vision inspection, not AQL sampling

​

v15_04_iso7_cleanroom_transparent.png

ISO 7

Class 10,000 molding and assembly

​

v2_05_iso-13485-certified.png

ISO 13485

certified · FDA registered

​

\ CAPABILITIES

Capabilities and technical specifications

Molding, bonding, surface functionalization and lyophilization feed the line directly, so a part is never handed to another company between the process that made it and the one that consumes it; benchtop to fully automated under one quality system. Vision inspection on every unit, with a defect map per part.

Line capability

Throughput and placement figures are confirmed per program at DFM.

PARAMETER

SPECIFICATION

Cleanroom class

ISO 7 / Class 10,000 for molding and assembly

Line architecture

Workstations connected by automated transfer and electrical control systems

Levels of automation

Manual benchtop · semi-automated fixtures and stations · fully automated robotic lines

Operations available

Loading · filling · dispensing · sealing · labeling · lamination · die-cutting · surface treatment · lyophilized-reagent detection and loading · PSA bonding · vision inspection · packaging

Hybrid constructions

Dedicated workflows for polymer–glass–silicon systems, where the sequence has to respect three materials and three thermal budgets

Inspection coverage

100% automated visual inspection with software-generated defect mapping

Standalone services

Assembly of parts made elsewhere; automated inspection of devices built elsewhere

Minimum order

Quantity one accepted

Throughput · placement accuracy · first-pass yield

Units per hour by line, PSA and component placement accuracy, first-pass yield

Quality system

ISO 13485 certified · FDA registered

Three levels of automation

Every program goes up the same ladder, and we will say when stopping at the second step is the right answer.

ASPECT

MANUAL

SEMI-AUTOMATED

FULLY AUTOMATED

What it is

Benchtop, by hand. Every program starts here, and it should

Operators plus tooling — fixtures and semi-automated stations

Sealing, labeling, lamination, dispensing and die-cutting on a robotic line, with end-of-line testing

What it is for

A process you can watch, measure and correct. This is where the work instructions, fixtures and acceptance criteria get written

The steps that drive yield — alignment, sealing, dispensing — move onto fixtures while judgment stays with the operator

Sustained volume against a frozen process

Choose it when

The device is still changing, or the first units are evaluation builds

Most products ship at this level for a long time

The volume is there and the process has stopped changing

What it costs

Operator variance — the result depends on who built the unit, and when

Fixtures per revision

Flexibility — an automated line becomes a constraint on your own design if the device is still moving

The usual case for automation is labor cost. In microfluidics the stronger one is variance.

A hand-placed PSA layer varies by operator and by hour, and that variance appears downstream as channel-volume drift and assay CV. The line removes the operator from the tolerance stack. It does nothing for a bad method except produce more of it faster — which is why a line is built around a process that has first been run by hand.

Equipment

Fully automated visual defect inspection system — the equipment that inspects every unit and maps its defects.

hero

Each unit is registered to a fixed reference before imaging, so defect coordinates are comparable across the run. The unit is then imaged and classified against the defect library agreed for the device, and each defect is located and mapped on the part. The system runs as part of a line, or as a standalone service on devices built elsewhere.

hero

\ MATERIALS

Materials

Beyond the molded or machined substrate, an assembled microfluidic device is a stack of bought and made components. These are the ones that most often pass through the line.

Device substrates

hero

Thermoplastic parts — COC/COP, PMMA, PC, PS, PP

WHERE IT COMES FROM

Our cleanroom molding or CNC machining, or parts made elsewhere

ASSEMBLY CONSIDERATION

Bonded before or on the line — PSA lamination in line; thermal, laser and solvent routes on the bonding page

hero

PDMS

WHERE IT COMES FROM

Our PDMS manufacturing

ASSEMBLY CONSIDERATION

Plasma-activated surfaces begin reverting within about fifteen minutes unless thermally aged, so bonding follows treatment closely

hero

Glass and silicon

WHERE IT COMES FROM

Our glass and MEMS processes

ASSEMBLY CONSIDERATION

Hybrid polymer–glass–silicon systems run on dedicated workflows, respecting three thermal budgets​

​

Components that pass through the line

COMPONENT

ROLE

ASSEMBLY CONSIDERATION

Pressure-sensitive adhesive (PSA) tape

Sealing layer, channel lid, double-sided bonding between layers

Registration is the constraint — a PSA layer that shifts changes channel volume, so it is applied under vision alignment

Sealing films and foils

Reagent chamber closure, blister sealing

Seal integrity has to survive shipping and storage, not just the seal test on the day

Membranes and filters

Plasma separation, particle capture, vent and hydrophobic barriers

Cannot be heat-bonded without changing pore structure; usually PSA-mounted or clamped

Lyophilized reagent

Dry-stored assay chemistry loaded into the device

Humidity-sensitive — detection, loading and closure are sequenced so the bead is never exposed

Gaskets and O-rings

Compression sealing at fluidic interfaces

Placement force and compression set decide whether the seal holds at pressure

Tubing and fluidic connectors

External interface

Insertion depth and retention are the usual failure modes; both are verified on assembly

Magnetic and functional particles

Sample preparation and capture chemistry

Handled dry or in suspension; may require conformal coating beforehand

Labels and identifiers

Traceability, lot coding

Applied and read back on the line, so the ID on the device matches the record

Two components decide the process order.

Membranes cannot see heat without their pore structure changing, and lyophilized reagent cannot see ambient humidity. Both therefore go in late, under PSA or clamping, and both are verified before the device is closed rather than after.

​

The related services handle the rest. Every bonding route, including PSA lamination as a standalone service, is on Bonding & sealing. Blisters, capsules, beads and in-situ drying are on Reagent storage & lyophilization. The hydrophilic, hydrophobic and patterned treatments we apply in line are on Surface treatment & functionalization. Grade-level substrate data is in the Materials guide.

\ PROCESS

Assembly process

Evaluation builds by hand and on fixtures; volume on the automated line. One inspection and packaging step for both.

  • Track A — Manual and semi-automated evaluation builds

Where the work instructions, fixtures and acceptance criteria are written. Most products ship from here for a long time.

hero

Assembly requirements

Bill of materials, assembly sequence and acceptance criteria agreed. We receive parts made anywhere and inspect them in.

​

The 4-week clock starts here

​

hero

Manual benchtop build

Built by hand so the process can be watched, measured and corrected; work instructions and fixtures come out of this step.

Quantity one accepted

​

hero

Fixtured semi-automated stations

Alignment, sealing and dispensing move onto fixtures and stations; judgment stays with the operator.

​

Alignment · sealing · dispensing on fixtures

  • Track B — Fully automated line

As run for centrifugal biochemical assay discs — six operations in a fixed order, the last of them vision inspection, two of them environmentally sensitive.

hero

Automated loading

Substrates fed and registered to the line.

​

​

​​

​

​

Extended cure for PDMS molds

hero

Filling and sealing

Liquid reagent dosed and chambers sealed.

​

​

​

​​

​

Seal verified on the line

hero

Hydrophilic treatment

Wettability applied in line, in the correct order — treatment before closure, because a treatment cannot reach a sealed channel.

Before closure, not after

hero

Lyophilized-reagent detection and loading

Each bead is detected before it is placed, so a missing or damaged bead is caught rather than sealed in.

​

Detected before placed

hero

PSA bonding

Adhesive layer applied under vision alignment and laminated; registration is what holds channel volume.

​​

 

Under vision alignment

  • Finishing — common to both tracks

hero

Vision inspection and defect mapping

Every unit imaged and classified against the agreed defect library; defects located on the part and aggregated across the run.

​

100% of units, not an AQL sample

hero

Packaging and release

Lot coding and identifier read-back on the line; individually packaged in PE bags or self-seal sterilization pouches, non-sterile unless sterilization is ordered.

PE bag or sterilization pouch

Process order is what outsourced assembly most often gets wrong.

On a PSA-closed device the surface treatment has to go on before closure; reagent has to be verified before it is sealed in; a placed bead cannot wait at a downstream station in ambient humidity. When the operations sit at different suppliers, nobody owns the sequence. On one line, the sequence is the line.

hero

\ QUALITY CONTROL

Quality control

Coverage

100% automated visual inspection, not AQL sampling

​

Dimensional

Inspection to the approved drawing and inspection plan

Reagent integrity

Lyophilized bead presence and condition verified before the device is closed

Validation deliverables

IQ/OQ/PQ, process validation reports, defect-library sign-off, customer witness

Defect mapping

Software-generated spatial map per unit, aggregated across the run

Functional

Leak and flow testing where the device requires it

​

Traceability

Lot coding and identifier read-back on the line

​

Quality system

ISO 13485 certified · FDA registered · customer audits accepted

Where the defect is matters as much as how many there are.

A count tells you the yield. A map tells you where the failures cluster — at one gate, one station or one edge of the nest. That is the difference between knowing you have a problem and knowing what to change.

\ LEAD TIME & MOQ

Lead time & MOQ

v16_01_lead_time_4weeks_transparent.png

Lead time

4 weeks to set up a new device on a line, from receipt of specific assembly requirements — the bill of materials, the assembly sequence and the acceptance criteria. Repeat lots are quoted per program

v16_04_sterilization_transparent.png

Sterilization

Available on request as a supplied service

​

​

​

​

​

​

v16_07_pricing_per_program_transparent.png

Indicative pricing

Quoted per program

 

v16_02_min_order_qty1_transparent.png

Minimum order

Quantity one accepted; parts made anywhere

​

​

​

​

v16_05_two_locations_transparent.png

Where the work is done

Automated production lines in the Suzhou manufacturing facility; chip bonding in the US cleanroom; US injection-molding capacity being brought online through a US partner. A program that requires US assembly should say so early — it changes the plan

v16_03_delivery_pouch_transparent.png

Delivery format

Individually packaged in PE bags or self-seal sterilization pouches; custom packaging on request. Pouch type is not a sterility claim — parts ship non-sterile unless sterilization is ordered

​

v16_06_scale_up_transparent.png

Scale-up

The same documentation covers evaluation builds and continuous production

​

​

​​

​

 

“Specific assembly requirements” is the gating item, not the four weeks.

Programs that arrive with the bill of materials, the sequence and the acceptance criteria defined move straight into the four weeks. Programs that arrive with a device and an intention spend time on definition first, and that is usually the longer part.

\ SHOWCASE

Showcase

Sample parts

Three lines running today, each doing something a single supplier usually does not.

hero

Injection molding automation 

pipette tips

WHAT IS AUTOMATED

Injection molding, vision-based inspection and automated packaging as one uninterrupted operation in an ISO Class 10,000 cleanroom

​​

​

WHY IT IS DIFFICULT

High volume with zero tolerance for handling contamination; the value is in never touching the part between press and pack

​​

​

hero

Downstream assembly automation

centrifugal biochemical assay discs

WHAT IS AUTOMATED

Automated loading, filling and sealing, hydrophilic treatment, lyophilized-reagent detection and loading, PSA bonding, quality inspection​

WHY IT IS DIFFICULT

Six operations in a fixed order, two of them environmentally sensitive. Treatment has to precede closure and reagent has to be verified before it is sealed in — get the order wrong and the device is scrap

hero

Automated quality inspection

standalone

WHAT IS AUTOMATED

Automated device alignment, vision-based defect inspection, software-generated defect mapping

​

​​

​

WHY IT IS DIFFICULT

Runs on devices built elsewhere, which makes it available to customers who assemble in house but have no inspection capacity

​​​

​

hero

Pipette tips — molded, inspected and packed in one cleanroom cell, never handled between press and pack

hero

Centrifugal assay-disc line — loading through PSA bonding in one fixed sequence

hero

PSA layer applied under vision alignment and laminated

hero

Per-unit defect map — where the failures cluster, not just how many.

Applications

hero

CARTRIDGES

Filled, sealed, reagent-loaded and PSA-bonded cartridges, each one inspected, at consumer unit cost.

hero

SAMPLE PREPARATION

Cartridges carrying membranes, magnetic particles and sealed reagent chambers, sequenced so none is exposed.

hero

SAMPLE-TO-ANSWER

Molecular cartridges where lyophilized reagent is detected and loaded in line, before closure.

hero

CONSUMABLES

Molded, inspected and packed without handling — the cleanroom classification kept through to the sealed bag.

FAQ

\ RELATED

Related services

molding-workshop-conveyor-operator-01.jpg

Where the parts come from — ISO 7 molding upstream of the assembly line.

Bonding fixture press station

PSA lamination, thermal, laser and solvent bonding — in line or as a standalone service.

hero

Blisters, capsules and lyophilized beads loaded on the same line, plus in-situ drying.

Abstract White Waves

\ START HERE

TELL US ABOUT YOUR PROJECT

Reply within 2 business days.
NDA on request.

Project stage
Prototype
Pilot batch / process verification
Production
Quantity (per month at production)
Fewer than 20
20–200
200–2,000
More than 2,000
How did you hear about us?

By sending this, you agree that we may contact you about your inquiry. We do not add you to a mailing list.

Prefer to talk it through first? Book a design review →

bottom of page